Just forge one 60 minutes ago. Got 1k payout, just wondering if this is like a once in a while kind of thing. I always fell down my chair when I saw the payout. I kind of told my wife and she goes HEY FOOL MAKE SURE TO CHECK THE ELECTRICITY CONSUMPTION!!! LOL. I hope you guys have a better understanding significant other!
Anyways, finished plotting on a decom'd exchange server E5-2650x2 @ 32 cores but lacking on the disk department only 3.3TB only its all in mini SAS disks :( It was doing 24k nonces while plotting with 31 cores lol
I also had to rebuild another server with a RAID-5 that I plotted. I ended up doing RAID-0 on each of the drives it ended with 16+ drives but they are the older SAS drives on a Dell PowerVault 16 slots, bunch of 300GB and 146GB drives maybe half half. So far it's doing 10k nonces/min.
I'm dreading to do the 8TB drives.. I think even putting that on the 32Core server its probably still going to be slow.
